Winter Works 2015-2016 ?>

Winter Works 2015-2016

Sharlston Colliery pit wheel
The “spare” winding wheel from Sharlston Colliery

Our regular volunteers have been busy during the winter months, working on a variety of projects. The old pit wheel (the “spare” from Sharlston Colliery in West Yorkshire) has been moved with the aid of a Tirfor winch to allow the top of the mine tip to be cleared. This will allow another track to be laid alongside the existing container.

A replacement body for the Hudson v-skip tipper wagon has been obtained from Alan Keef Ltd. which will allow the old one to be repaired, and the replacement is good enough to start using it straight away. There is a lot of rock to be moved from the top of the mine tip, mostly quarry waste which can be sorted into large (for building material) and small (for hardcore).

Meanwhile the WR5 has been placed onto a flat wagon so it can be moved around easily until there is an opportunity to fix the suspected worm drive fault. This also means the WR8 can be moved into the container with the Simplex and hopefully it will be running by the spring.

Comments are closed.